Content Scheduling
Schedule Creation
Setting Up a Basic Schedule
- Access Form
- Navigate to the Scheduled Content section in the Visual Experience Engine.
- Create new scheduled content.
- Or click Edit on an existing banner.
- Set Schedule Details
-
Scroll to the Schedule Settings section.
-
Click on "Add New Schedule" to create a new schedule entry.
-
Start Date:
- Select the start date and time when the banner should begin displaying.
- Use the date picker to choose the exact date and time.
- All times are based on your local timezone.
-
End Date:
- Select the end date and time when the banner should stop displaying.
- Ensure that the end date is after the start date.
- Leave blank for indefinite campaigns (if supported by your configuration).
-
Slot:
- Select the slot number where the banner will appear.
-
Schedule Rules and Validation
-
Mandatory Fields:
- Start Date, End Date, and Slot are required fields.
- You must have at least one schedule per banner to publish.
-
Validation System:
- The system enforces that the end date must be after the start date.
- If you attempt to save a schedule with errors, validation messages will appear.
- All scheduling conflicts are flagged before publishing.
Schedule Management
Editing Schedules
-
Modify an Existing Schedule
- Within the Scheduling section, locate the schedule you want to edit.
- Change the Start Date, End Date, or Slot fields as necessary.
-
Save Changes
- After editing, click Save to apply your changes.
- Ensure that you save changes after editing each schedule.
Deleting Schedules
- Click the "Delete" link next to a schedule to remove it.
- Confirm the deletion if prompted.
- The system ensures at least one schedule remains per banner.
Multiple Schedules
You can add multiple schedules to a single banner to display it at different times or in different slots. For details on managing multiple schedules and creating complex scheduling patterns, see Advanced Scheduling.
Best Practices
-
Consistent Slot Usage:
- Keep track of which banners are assigned to each slot.
- Use descriptive slot IDs that match your website's HTML for easier management.
-
Avoid Overlapping Schedules:
- Ensure that multiple banners assigned to the same slot do not have overlapping schedules.
- This prevents conflicts where multiple banners might try to display simultaneously.
- For detailed conflict resolution strategies, see Advanced Scheduling.
Scheduling Template Banners
When working with banner templates, consider these additional scheduling considerations:
Template-Specific Scheduling
- Responsive Design: Template banners automatically adapt to different devices, so ensure your device selection matches your target audience
- Variable Updates: Schedule template variable updates to coincide with campaign changes or seasonal updates
- Performance Optimization: Template banners are optimized for fast loading, making them ideal for high-traffic time periods
Template Scheduling Best Practices
- Consistent Timing: Use templates to maintain consistent banner scheduling across multiple campaigns
- Variable Scheduling: Consider scheduling different variable configurations for different time periods
- Template Rotation: Rotate between different templates while maintaining consistent scheduling patterns
Template vs. Custom Banners
- Templates: Faster to create and schedule, consistent responsive behavior
- Custom Banners: More flexibility but require additional testing and scheduling considerations
Learn more about Banner Templates and their scheduling capabilities.